CASE STUDY: Energy Optimisation for Rubber & Plastics Manufacturer
Power Maintenance helped a manufacturing plant cut energy costs by 42%, saving up to $2.06 million annually. Strategic upgrades, including LED lighting and demand response systems, improved efficiency and sustainability.
CASE STUDY: Energy Cost Optimisation for a Victorian Industrial Plant
Reducing high operational costs, increasing profitability, and implementing a strategic long-term approach to optimise costs while ensuring operational stability.
CASE STUDY: Transforming Energy Efficiency for a South Australian Chicken Farm
A Sustainable Energy Overhaul for a South Australian Broiler Chicken Farm